top of page

PINE POINT SCHOOL

ENERGY RETROFIT / INDOOR AIR QUALITY

Pine Point picture for website
Pine Point picture for website.02
Pine Point picture for website.03
Pine Point picture for website.04 (solar)

Under Development

 

TYPE: Independent School

LOCATION: Stonington, CT

BUILDING SIZE: 55,300 SF

SUSTAINABILITY UPGRADES

  • HVAC Upgrades

  • Geothermal

  • Fresh Air Systems

  • Stand-by Power

  • Attic Insulation

  • Building Envelope Improvements

MHR developed an Energy Audit / Opportunity Assessment for Pine Point School.  Several of the measures explored include HVAC, additional solar (beyond the two roof-mounted solar systems currently installed), and geothermal. 

 

Additionally, MHR will be assisting the school with managing the installation of a climate control system and improving indoor air quality (IAQ).

bottom of page